Maintenance Datacenter Move 01/02/2013

Matt

Administrator
Our server provider is going to be moving the node we sit on into a new datacentre on the evening of 01/02/2013.

Work will start at 22:30, and should have finished by 00:45 on the 2nd. During this time, the site will be offline (not worth failing over to the second server for 2 hours down time).

Interxion, the datacentre in central London where your servers are hosted, have recently completed the build
out of their newest 'Interxion LON2' facility.

This new building is on the same campus as the existing datacentre, has access to the same range of networks
(including LINX and major Tier-1 carriers) however it has been designed and built to the latest standards.

With more datacentre space available for our expansion in LON2 we have decided to consolidate our
datacentre footprint in the new building.

This means we are in the most modern, best connected datacentre in the heart of London.

More than 1700m2 of equipped space
8 MVA redundant grid supply
2N UPS power
N+1 cooling
Access to over 50 Carriers
Powered by 100% renewable energy
ISO 27001-certified

More information about the new facility is available at

http://www.interxionlon2.co.uk/

Our London office is in an adjacent office building.

It will be necessary to power down the host server where your VPS is located and move it a short distance.

Maintenance starts:

1 February 22:30

Maintenance ends:

2 February 00:45
 