Didn't even take me 10 minutes?
Removed airbox to tb pipe, then removed airbox. Put vec c pipe in, put a self tapprr through the hole on the slam panel, popped the hose connector on, popped airbox back in, screwed it all down the fitted airbox to tb pipe. Job done.